Sanyo Engineering & Construction INC.

Submitted by oswebmaster on Fri, 04/24/2020 - 10:44

Design, Engineering and Upgrading of 11kV Power Supply System at Sg. Liang 66/11kV Substation and Stage 5 Water Treatment Works with Supply and Deliver of:

  1. Areva One (1) set of 72.5kV Outdoor Dead Tank Circuit Breaker.

  2. 3 units of Toshiba 72.5kV Outdoor SA.

  3. 72.5kV Clamps & Conductors.

  4. Installation and Commissioning of AVR and All

    Related Inclusive of Engineering Working CRP and Supply of Accessories.