Design, Supply and Construction of Approximately 190km (+/- 5km) Long High Voltage Double Circuit Transmission Line from Stung Hav Substation to Phnom Penh Comprising of:
1. Approximately 50km Long 230kV Double Circuit Transmission Line from Stung Hav Substation.
2. Approximately 140km Long 500kV Double Circuit Transmission Line from Chamkar Loung Substation to Bek Chan Substation.
3. OPGW Communication System and Overhead Ground Wire.

From 230kV Stung Hav Substation
From 500kV Chamkar Loung Substation to Bek Chan Substation