Tenaga Nasional Berhad
Supply, Erect and Commissioning of 132kV and 33kV Switchgear, Transformer and Ancillary Equipment, Complete with Associated Civil Works for PMU 132/33kV Bukit Siput Extension (2x90MVA), Johor.
Supply, Erect and Commissioning of 132kV and 33kV Switchgear, Transformer and Ancillary Equipment, Complete with Associated Civil Works for PMU 132/33kV Bukit Siput Extension (2x90MVA), Johor.
Supply, Erect and Commissioning of 132kV and 33kV Switchgear, 2x45MVA 132/33kV Power Transformer and Ancillary Equipment, Complete with Associated Civil Works for PMU Jerantut.
Engineering Package with Design, Engineering, Supply, Supervision on Erection, Testing & Commissioning for the 132kV Main Intake Substation Project at Gas Processing Plant Complex A (GPPA) Kertih, Terengganu, Malaysia.
Establishment of PMU 132/33kV 2x45MVA at PMU New Bukit Ketri.
Turnkey Project Includes Engineering, Design, Install, Testing & Commissioning and Warranty of 132/33kV Substation at Sakura Ferroalloys Project, Samalaju Industrial Park, Sarawak, Malaysia.
Design, Engineering, Supply, Erect and Commissioning of Samajaya GIS 132/33/11kV Substation Establishment.
Engineering, Procurement and Construction, Commissioning & Testing and the Handing Over and Providing Defect Liability Coverage of 18 months for a New 132/33kV Substation.
Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.
Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.
Design, Engineering, Supply, Erect and Commissioning of Extension of 2 x 132kV OHL Bays at PMU Kampung Awah and Associated Works at PMU Kampung Awah and PMU Jengka, Pahang, Malaysia.