Tenaga Nasional Berhad
Proposed Establishment of 3rd & 4th 132/33kV Transformers Bays and Refurbishment of Existing Hyusong GIS at PMU Pandan Maju GIS Substation.
Proposed Establishment of 3rd & 4th 132/33kV Transformers Bays and Refurbishment of Existing Hyusong GIS at PMU Pandan Maju GIS Substation.
The Design, Manufacture, Supply, Delivery, Installation, Testing and Commissioning of the Additional 1 X 45MVA 132/33kV Transformer at Sandakan & Tawau Main Intake Substation and Other Related Civil Works.
Design, Engineering, Supply, Installation, Commissioning of 132kV and 11kV High Voltage Switchgear Equipment, 132/11kV 20/25MVA Power Transformer, 11.0kV XLPE Power Cables, Ancillary Equipment and Civil Works for the Single Busbar Arrangement for 132/11kV Hidden Valley & 1-1/2 Breaker Design System for 132kV Erap Switching Station in Papua New Guinea.
Design, Engineering, Supply, Erect and Commissioning of 132kV Ancillary Equipment for PMU 275/132/33kV Bukit Tambun Extension.
Design, Engineering, Supply, Erect and Commissioning of 132kV Ancillary Equipment for PMU 275/132/33kV Bukit Tambun Extension.
Termination of 22kV Power Cable to Siemens GIS Switchgear Using Plug-In Type Termination.
Termination of Transformer Trail for 33/11kV Power Transformer at PPU Gelugor, Penang.
Installation of 33/11kV Switchgear & Its Ancillary Equipment in TNB PPU Substation in Central Region.
Retrofitting & Commissioning of 33kV, 22kV & 11kV Switchgear in TNB Substation for Northern & Southern Region.
Installation & Commissioning of 33/11kV GIS Switchgear and Substation Control System Including Laying of Fiber Optic Cable.