PNG Power Ltd

Submitted by oswebmaster on Mon, 04/27/2020 - 01:36

Design, Engineering, Supply, Installation, Commissioning of 61850 SAS System at 132/11kV Hidden Valley Substation & 132kV Erap Switching Station in Papua New Guinea.

SEC Mashibah Sdn Bhd

Submitted by oswebmaster on Sun, 04/26/2020 - 04:22

Design, Engineering, Manufacture, Supply, Install, Testing and Commissioning of Telecommunication Panel for 66kV Interconnection from BPC Gadong 3 Power Station to DES Gadong 2 Power Station.

PNG Power Ltd

Submitted by oswebmaster on Fri, 04/24/2020 - 16:08

Design, Engineering, Supply, Installation, Commissioning of 132kV and 11kV High Voltage Switchgear Equipment, 132/11kV 20/25MVA Power Transformer, 11.0kV XLPE Power Cables, Ancillary Equipment and Civil Works for the Single Busbar Arrangement for 132/11kV Hidden Valley & 1-1/2 Breaker Design System for 132kV Erap Switching Station in Papua New Guinea.