Keretapi Tanah Melayu Berhad (KTMB)
Repair Works for Damaged of Overhead Catenary System (OCS) Equipment Due to Derailment of KTMB Goods Train No.344 at Batu Gajah on 28.10.2016.
Repair Works for Damaged of Overhead Catenary System (OCS) Equipment Due to Derailment of KTMB Goods Train No.344 at Batu Gajah on 28.10.2016.
System Works Comprising (Design and Build):
Design, Construction, Completion, Testing, Commissioning and Maintenance of the Systems Works (excluding TETRA).
To Install OCS System and Components for Redline Project including Machinery for Sector Bang Sue to Rangsit.
Turnkey Contract for Design and Build for Electrification Works Package including OCS and TPS for 200km Gemas to Johor Bahru, Malaysia.
MRT2 Metro Project Engineering, Procurement, Construction, Testing & Commissioning of Power Supply and Distribution System.
Repair Works for Damaged of Overhead Catenary System (OCS) Equipment at Segambut - Spg. Batu (UM, DM & Sentul By Pass Line) Due to Derailment of KTMB Cargo Train No.328.
Re-energized, Installation, Testing & Commissioning of Overhead Line System at Platform 2 (Up Loop) Subang Jaya Station.