Installation Works And Cabling/Termination Works

Year Client Description Country Substation Name
2017 Fornix Sdn Bhd

The Supply, Installation, Testing & Commissioning of HT System Installation for Fornix Bukit Beruntung Factory.

Malaysia Fornix Bukit Beruntung Factory
2016 Bormal Engineering Sdn Bhd

Provide Electrical Installation Works at Tanjung Manis 2 132/33kV Substation Project.

Malaysia Tanjung Manis 2 132/33kV
2010 Tenaga Nasional Berhad

Refurbishment Works for 11kV and 33kV CRP at PMU Tanjung Langsat, Johor.

Malaysia PMU Tanjung Langsat
2009 Vestech Project Sdn Bhd

Provision for Mechanical and Electrical Works for 3 Level Factory and Office Lot at Shah Alam.

Malaysia Shah Alam
2009 Siemens AG Power Transmission & Distribution

Change of CB Aux. Contact for PDS Relay in Bay 1, 2 and 3 at PMU KL North.

Malaysia PMU KL North
2009 Tenaga Nasional Berhad

Repair and Installation at SSU Taman Daya.

Malaysia SSU Taman Daya
2007 Areva T & D Malaysia Sdn Bhd

Supply of 250 meter of 4 pairs of PE Insulated Shielded Screened Armoured Cable.

Malaysia PMU 500/275kV Lenggeng
2007 Perunding GPL Sdn Bhd

Installation, Testing and Commissioning of 2 Panels Tamco 33kV VH3D Double Busbar Switchgear and Incontrol Tech Relay Control Panel with Inclusive of Multicore Cabling and Termination Works.

Malaysia KHTP
2004 Tenaga Nasional Berhad

Supply of Multicore Cables for PMU Batu Caves.

Malaysia PMU Batu Caves
2004 Pembinaan Tajri Sdn Bhd

Installation, Testing & Commissioning of 33 & 11kV Switchgear and Control Panel at PPU Tanming Jaya, Selangor.

Malaysia PPU Tanming Jaya
2003 Warna RS Sdn Bhd

Installation, Testing & Commissioning of Power Transformer MTM 33/11kV 30MVA at PPU Semangar Water Works, Kota Tinggi, Johor.

Malaysia PPU Semangar Water Works
2003 Tamco Corporate Holdings Berhad

Installation, Laying, Termination, Supply & Dismantling Works of 33kV Switchgears, Control Panel and Other Necessary Accessories for Eight (8) Northern and Selangor Substations.

Malaysia PMU Sg. Ramal, Selangor , PMU Bkt. Badong, Selangor, RWPS, Batang Berjuntai, Selangor, PMU DCA, Selangor , PMU Hicom G, Selangor, PMU Mak Mandin (Tikam Batu), Penang, PMU Bayan Baru, Penang, PMU Prai Industry, Butterworth
2003 Warna RS Sdn Bhd

Design, Engineering, Manufacture, Supply and Delivery of 22kV NER and Earthing for PPU Bukit Tiram, Johor Bahru.

Malaysia PPU Bukit Tiram
2002 ABB Transmission & Distribution Sdn Bhd

Erection and Installation of 22kV Switchgears, Control Relay Panels & NER and Supply of Necessary Accessories for SSU Tasek, Perak, TNB Substation.

Malaysia SSU Tasek
2002 Tamco Corporate Holdings Berhad

Installation and Dismantling of 33kV & 11kV AIS Tamco Switchgear, Master & Control Panel & Marshalling Panel for Northern Projects.

Malaysia PPU Jalan Rozhan, PPU Kg. Teluk
2002 System Protection & Maintenance Sdn Bhd

Erection and Termination of Control & Relay Panels, 132kV & 11kV Switchgear, NER, MCP, LVAC Switchboard, Battery & Charger, Installation of CT and Supply of Necessary Accessories.

Malaysia 132/11kV PMU Pajam, Nilai
2002 ABB Transmission & Distribution Sdn Bhd

Installation and Erection of Substation Equipment of 11kV Switchgears, MCP, NER, Marshalling Kiosk and Supply of Necessary of Accessories for TNB Substation, PMU Green Town, Perak.

Malaysia PMU Green Town
2001 Warna RS Sdn Bhd

Installation & Commissioning of ABB 33kV GIS, EPE 11kV Switchgear, SIEMENS SCS for PPU in Central Region.

Malaysia PPU Putrajaya No.4 , PPU Putrajaya No.17, SSU Gas District Cooling Plant No. 2, , Putrajaya SSU Bukit Mahkota
2001 ABB Transmission & Distribution Sdn Bhd

Erection & Installation of 132kV and 11kV ABB Switchgear, Master Control Panel, Marshalling Cubical, Battery and Charger Equipment & LVAC Board and Supply, Laying and Termination Multicore Cables and Earthing System.

Malaysia PMU Kulai, Johor
2001 Naluri Saksama Sdn Bhd

Installation of 11kV and Adaptor & Connection of Main Busbar at PPU Waktu Cerah.

Malaysia PPU Waktu Cerah
2001 ABB Transmission & Distribution Sdn Bhd

Installation of 22kV ABB Switchgear, Control Relay Panel, Marshalling Cubical, etc. and Cable Ladder
at SSU Metro Larkin, Johor.

Malaysia SSU Metro Larkin
2001 ABB Transmission & Distribution Sdn Bhd

Installation of ABB Switchgear, Control Relay Panel and Copper Strip at SSU Carsem.

Malaysia SSU Carsem, Ipoh
2000 Warna RS Sdn Bhd

Installation, Supply of Control Panel and Glanding of Multicore Cable at PMU Tanjung Pauh & PPU UUM Sintok.

Malaysia PMU Tanjung Pauh, PPU UUM Sintok
2000 Warna RS Sdn Bhd

Live Coupling of ABB 33kV ZV2.3 GIS Switchgear to Existing Switchboard and Modification of Control Relay Panel at PPU Bagan Lalang, Butterworth.

Malaysia PPU Bagan Lalang
2000 Tamco Corporate Holdings Berhad

Coupling & Retrofitting Tamco 11kV Switchgear That Flashes Over at PPU Bukit Serdang, Selangor & Bukit Minyak, Butterworth.

Malaysia PPU Bukit Serdang , PPU Bukit Minyak
2000 ABB Transmission & Distribution Sdn Bhd

Installation of ABB 22, 11kV Switchgear and Master Control Panel in TNB Substation at Ipoh Area.

Malaysia SSU Bandar Baru, PPU Green Town, PMU Jalan Gopeng
2000 Tamco Corporate Holdings Berhad

Coupling of Additional 33kV Tamco AIS Switchgear to Existing Switchboard at PPU STC & PMU Prai Through Shutdown.

Malaysia PPU STC, PMU Prai
2000 ABB Transmission & Distribution Sdn Bhd

Installation of ABB Switchgears & Control Relay Panel and Supply of Multicore Cable.

Malaysia PPU Pengkalan Pagoh
2000 Penang Development Corporation

Supply, Testing & Installation of Tamco 11kV RMU.

Malaysia Komtar, Penang
2000 Warna RS Sdn Bhd

Supply Copper Strip & Accessories and Installation Earthing System at PPU 33/11kV Permatang Rawa, Bukit Mertajam, Penang.

Malaysia PPU Permatang Rawa
1999 Warna RS Sdn Bhd

Installation of 33/11kV Switchgear & Its Ancillary Equipment in TNB PPU Substation in Central Region.

Malaysia PMU Jalan Pantai, PPU Massalam (Rawang), PPU Puncak Alam, PPU SS 19, Shah Alam, SSU Matshushita
1999 Bun Foong Industrial Automation

Wiring & Assembly of Control Panel.

Malaysia
1999 Toprank Corporation Sdn Bhd

Rewiring, Modification & Retesting of 33kV & 11kV Control Relay Panel.

Malaysia PMU Bukit Tambun
1999 ABB Transmission & Distribution Sdn Bhd

Installation of RMU, Power Cable Laying & Commissioning for Plus Distribution System.

Malaysia Plus in Jelapang, Ipoh
1999 ABB Transmission & Distribution Sdn Bhd

Installation & Commissioning of 33/11kV GIS Switchgear and Substation Control System Including Laying of Fiber Optic Cable.

Malaysia PPU Jalan Larut , SSU NEGM, Shah Alam, PPU Putrajaya No. 5
1999 ABB Transmission & Distribution Sdn Bhd

Retrofitting & Commissioning of 33kV, 22kV & 11kV Switchgear in TNB Substation for Northern & Southern Region.

Malaysia SSU USM, SSU Plentong, PPU Johor Jaya, PPU Tenggaroh, PPU Mawai, PPU Saujana, Terengganu, PPU Kota Setar, SSU Kempas, SSU Kek Seng, SSU Gelang Patah, PPU Larkin, SSU KisWires
1998 Juruniaga Sdn Bhd

Termination of Transformer Trail for 33/11kV Power Transformer at PPU Gelugor, Penang.

Malaysia PPU Gelugor
1998 Toprank Corporation Sdn Bhd

Termination of 22kV Power Cable to Siemens GIS Switchgear Using Plug-In Type Termination.

Malaysia 1998 PMU Majidec
1998 CJ Hi-Tech Sdn Bhd

Termination & Laying of 132kV Cable for 132kV Power Transformer at Kampung Awah Substation.

Malaysia Kampung Awah
1998 CJ Hi-Tech Sdn Bhd

Laying, Termination of Power and Control Cable for Amsteel Plant in Shah Alam.

Malaysia Shah Alam
1998 Toprank Corporation Sdn Bhd

Installation of 33kV and 11kV Switchgear Control Relay Panel and Its Ancillary Equipment for TNB Northern Region PPU 33/11kV Substation.

Malaysia PPU Permatang Damai Laut , PPU Paya Terrubong, PPU Cegas Layar, PPU Honda HICOM, PPU Gelugor , PMU Bukit Tambun
1998 ABB Transmission & Distribution Sdn Bhd

Installation & Commissioning of 33kV Gas Insulated Switchgear & 11kV Switchgear for TNB PPU Substation in Northern Region.

Malaysia SSU Toray, SSU Chin Well, PPU MidLand Park, Penang, PMU Gelugor
1997 ABB Transmission & Distribution Sdn Bhd

Installation & Modification of ABB 33kV GIS Mobile Substation.

Malaysia
1996 Toprank Corporation Sdn Bhd

Installation and Commissioning of Siemens 22kV GIS Switchgear for PMU Majidec including Civil Work Modification to Support the New Switchboard.

Malaysia PMU Majidec
1996 Bun Foong Industrial Automation

Installation of Overhead Cables, Control Panel Boxes for 2 Factories.

Malaysia
1996 Golden Light Electric Co.

Laying of Control Cable for Power Station, Power Equipment and Panel Boxes for 3 Factories.

Malaysia
1996 ABB Transmission & Distribution Sdn Bhd

Installation and Commissioning of 22kV &11kV Switchgear & CRP for TNB Substations in the Southern Region, Including Laying of Multicore Cable.

Malaysia PPU Kebun Teh, PPU Desa Cermerlang, SSU Tebrau, Complex Custom, SSU Masai Changeh I, SSU Masai Changeh II, SSU Sri Alam, PPU Pasir Gudang, SSU Permas Jaya