The scope of this project includes the complete upgrade of the Distributed Control System (DCS), Boiler Protection System (BPS), Turbine Control System (TCS), Turbine Protection System (TPS), Turbine Supervisory Instrument (TSI) and conversion to high-pressure Turbine Hydraulic Governor Oil System at Kapar Energy Venture's Unit 3 Power Plant.