Client Name: Alex Corporation 
Commencement Date: 16 October 2015 
Completion Date: 15 February 2020

The project includes design, engineering, manufacturing, test delivery, installation, completion and commissioning of 230kV overhead line bays in the existing Stung Hav Substation, the 50km line-twin-TACSR transmission line from Stung Hav to Chamkarloung, the 140km line-ACSR Curlew transmission line from Chamkarloung to Bek Chan.

Client Name: Diamond Power Limited 
Commencement Date: 30 November 2015 
Completion Date: 30 October 2017

The project includes design, engineering, manufacturing, test delivery, installation, completion and commissioning of 230kV switchyard in the existing Kampong Cham Substation, new Kratie 230/22kV Substation and the interconnecting 125km long twin-ACSR Bittern transmission line from Kampong Cham Substation to Kratie Substation.

Client Name: Cambodian Transmission Ltd. 
Commencement Date: 5 February 2010 
Completion Date: 4 June 2013

This turnkey project includes engineering, design, install, testing & commissioning and warranty of 230/115/22kV North Phnom Penh Substation, 115/22kV Kampong Cham Substation (upgradable to 230kV) and 230kV Transmission Line.

Client: Sarawak Energy Berhad
Completion: October 2019

This project consists of design, engineering, supply, erect, test and commissioning of 275/(132)kV substation at New Bintulu B, Sarawak which includes indoor 275kV GIS plant and relative civil works.

Client: Tenaga Nasional Berhad
Completion: December 2019

This project includes design, engineering, supply, erect, test and commissioning of 275/230kV substation extension, and 2 x 250MVA Autotransformers complete with accessories and RTCC at Plentong, Johor.


color:black">This project includes of design, engineering, supply, delivery, installation, testing and commissioning of the following:

color:black">

color:black">1) Civil works

Client: Sarawak Energy Berhad
Completion: June 2017

This turnkey project includes the design & engineering, procurement, manufacture, testing at manufacturer's works, delivery to site, installation, pre-commissioning testing, commissioning and energising of all complete substation and associated civil, structure and M&E works of 132/33/11kV Substation at Samajaya Free Industrial Zone. The project marked the first 132kV Gas Insulated Switchgear (GIS) Substation that was built for SEB in Kuching, Sarawak. 

Client: Tenaga Nasional Berhad
Completion: October 2019

This project includes design, engineering, supply, erect and commissioning of 500/275kV AIS (2 x 1050MVA) complete with Auto Transformers, 275kV underground cable connection, 500kV switchgears, 275kV switchgears, Tahoma"> 275kV OHL connection, protection, telecontrol and all associated civil works. 

Client: Sarawak Energy Berhad
Completion: December 2015

This project is for the extension of the existing Mambong 275/132/33kV Substation and Entinggan 275/132kV Substation in Kota Samarahan which is located approximately 25km from Kuching, Sarawak, Malaysia. The project involves the entire EPCC works, i.e. design, engineering, procurement, construction, testing and commissioning.