PESTECH sees growth in solar, hydrogen fuel cells and battery storage systems
Client: Tenaga Nasional Berhad
Completion Date: December 2019
Establishment of PMU 132/33kV MRT Jinjang GIS (2x90MVA) and 132kV Overhead Line (KULE-KLJT/BCVS) Loop-In/Loop-Out Into PMU MRT Jinjang & 132kV Underground Cable from PMU MRT Jinjang to Bukit MRT Jinjang Switching Station, Malaysia.
Client: National Grid Corporation of the Philippines (NGCP)
Completion Date: October 2021
The scope of work include the following:
1. Tiwi Plant A Substation
- Electrical Works (Substation), Site Development and Switchyard Works, Relay Building, Generator Set Housing and Guard House
2. Tiwi Plant C Substation
- Electrical Works (Substation), Site Development and Switchyard Works, Control Building, Generator Set Housing and Guard House
3. Naga Substation
Client: PNG Power Ltd
Completion Date: July 2021
The scope of work include the following:
Design and engineering for the primary, secondary, civil, and ancillary system. Procurement, manufacturing, factory testing, project management, site supervision, installation, inspection, punch listing, cold and hot commissioning of the 66/11kV Power distribution system as detailed below:
Client: Sarawak Energy Berhad (SEB)
Completion Date: June 2021
The project scope includes design, engineering, supply, erect and commissioning of Lachau 275/33kV Substation Extension Project.