OTHERS PESTECH INTERNATIONAL BERHAD ("PESTECH" or "THE COMPANY") - MINUTES OF THE 10TH ANNUAL GENERAL MEETING AND EXTRAORDINARY GENERAL MEETING

Announcement: PESTECH Minutes of Meeting AGM and EGM 100122 - 01

Back

The 114kWp rooftop solar PV system has been successfully installed at PESTECH's Section U5 office in Shah Alam, Selangor. By installing this solar system, we have played our part to go green, reduce our reliance on municipally supplied power and lower the carbon footprint.

event-cover-image

PESTECH has installed Electric Vehicle (EV) Charging Stations consists of 2 units of 22kW EV Charger at Shaftsbury Square, Cyberjaya. The installation is essential for the Malaysia’s first EV ride-sharing platform with Malaysia’s leading car sharing network, SOCAR. The EV Chargers are tethered with predominantly used Type 2 Gun supplying a resilient charge of 22kW for the primarily used Battery Electric Vehicle (BEV), Renault Zoe. 

event-cover-image

PESTECH’s 22kW EV Chargers were installed at DPulze Shopping Mall, Cyberjaya. The EV Chargers are tethered with predominantly used Type 2 Gun supplying a resilient charge of 22kW for the primarily used Battery Electric Vehicle (BEV), Renault Zoe.

By installing the EV Charging Stations, PESTECH has enabled the facilities for EV charging in which increase the demand and purchase of the EVs. This indirectly contribute to sustainable environment as the EV usage will help to reduce carbon emission.

event-cover-image

PESTECH have installed 7kW and 3.7kW EV Chargers at Wisma Tenaga Nasional located at Jalan Timur, Kuala Lumpur. These EV Chargers facilitate the authorised VIP users to charge their Battery Electric Vehicles (BEVs) and Plug-in Hybrid Electric Vehicles (PHEVs) with charging authentication via holistic myEVC Mobile Application solution. 

Electrical vehicle usage will reduce carbon emission, thus will contribute to sustainable environment.

event-cover-image

PESTECH has installed a 7kW EV Charger at Putrajaya Corporation Complex as to showcase our expertise in digitalisation during the Digital Putrajaya Conference (DiPEC) with TNB Smart City. The EV Charger can be used by any of EV users in Putrajaya.

Helen Tan Miang Kieng

Submitted by webmaster on Tue, 01/11/2022 - 17:32

Helen Tan Miang Kieng is the Independent Non-Executive Director of PESTECH. She was appointed on the Board on 25 November 2021.

 

BOARD COMMITTEE MEMBERSHIPS

  • Member of Audit Committee
  • Member of Remuneration Committee
event-cover-image

The Smart Meter’s primary function is to accurately measure energy consumption and optimize meter data management processes for buildings and homes. It is a robust smart electronic device that enables energy savings and integration of renewable energy resources. It helps in reducing consumption of fossil fuel resources, thereby reducing emission of greenhouse gases and other air pollutants.

event-cover-image

PESTECH has completed with the installation of 7kW EV Chargers in Atria Shopping Mall at Damansara Jaya, Selangor. This is in partnership with ParkEasy, a local parking bay reservation service provider. PESTECH will deploy, operate and maintain 3 units of the EV Chargers in the mall.