Back
GENERAL MEETINGS: NOTICE OF MEETING
OTHERS PESTECH INTERNATIONAL BERHAD ("PESTECH" or "THE COMPANY") - ANNOUNCEMENT BY PESTECH (CAMBODIA) PLC ("PCL"), A SUBSIDIARY OF PESTECH LISTED ON THE CAMBODIA SECURITIES EXCHANGE ("CSX")
TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS) : NON RELATED PARTY TRANSACTIONS PESTECH INTERNATIONAL BERHAD ("PIB" OR "COMPANY") PROPOSED DISPOSAL BY DIAMOND POWER LIMITED ("DPL" OR "VENDOR"), A 60%-OWNED INDIRECT SUBSIDIARY OF PIB, OF THE 230 KILOVOLT KAMPONG CHAM-KRATIE TRANSMISSION SYSTEM ("PROJECT") TO CAMBODIAN TRANSMISSION II CO. LTD ("CTL II" OR "PURCHASER") FOR A TOTAL CONSIDERATION OF USD118.00 MILLION ("PROPOSED DISPOSAL")
OTHERS PESTECH INTERNATIONAL BERHAD ("PESTECH" or "THE COMPANY") - ANNOUNCEMENT BY PESTECH (CAMBODIA) PLC ("PCL"), A SUBSIDIARY OF PESTECH LISTED ON THE CAMBODIA SECURITIES EXCHANGE ("CSX")
The scope of this project includes the complete upgrade of the Distributed Control System (DCS), Boiler Protection System (BPS), Turbine Control System (TCS), Turbine Protection System (TPS), Turbine Supervisory Instrument (TSI) and conversion to high-pressure Turbine Hydraulic Governor Oil System at Kapar Energy Venture's Unit 3 Power Plant.
Location: Sungai Buloh, Serdang & Putrajaya, Malaysia
The project scope includes design and build turnkey for Power Supply and Distribution System (PSDS) package for a span of 53km from Sungai Buloh to Putrajaya. MRT-2 line is a connectivity line from the existing MRT-1 from Sungai Buloh to Kajang.