Sanyo Engineering & Construction INC.
Design, Engineering and Upgrading of 11kV Power Supply System at Sg. Liang 66/11kV Substation and Stage 5 Water Treatment Works with Supply and Deliver of:
-
Areva One (1) set of 72.5kV Outdoor Dead Tank Circuit Breaker.
-
3 units of Toshiba 72.5kV Outdoor SA.
-
72.5kV Clamps & Conductors.
-
Installation and Commissioning of AVR and All
Related Inclusive of Engineering Working CRP and Supply of Accessories.
Sg. Liang 66/11kV
Year Delivered / Completion